A release is a pull request and one workflow run. Everything that leaves the
repository — the tag, both gems, and the GitHub release — is produced by the
Release gems workflow, so nothing has to be built or pushed from a laptop.
Each release ships two gems:
| Gem | Platform | Parser |
|---|---|---|
rbs-X.Y.Z.gem |
ruby (MRI) |
C extension, compiled on install |
rbs-X.Y.Z-java.gem |
java (JRuby) |
rbs_parser.wasm, built by the workflow |
The -java gem contains no native code — just rbs_parser.wasm. The Chicory/ASM
jars it needs are not shipped in the gem; they are declared as jar-dependencies
requirements and fetched from Maven when the gem is installed. So the gem can be
built once in any environment and runs on every JRuby.
There are three kinds of release, and they differ in what gets written up:
| Version | CHANGELOG section | GitHub release |
|---|---|---|
X.Y.Z |
The whole cycle since the previous release proper, prereleases included | Published |
X.Y.Z.pre.N |
What changed since X.Y.Z.pre.N-1 |
Published, marked as a prerelease |
X.Y.Z.dev.N |
None | None |
.dev.N releases are cut from the development line for people who need a change
early, so they are gems and tags and nothing else.
Push rights to the rbs gem on RubyGems are not needed: the workflow
authenticates through a trusted publisher registered for this repository and
release-gems.yml. What is needed is write access to the repository, since that
is what lets you dispatch the workflow.
The release pull request in step 1 is merged by a person who has reviewed it. Its merge commit is what step 2 dispatches, tags, and pushes to RubyGems, and none of that can be taken back — so prepare that pull request and stop there, rather than merging it and carrying on to step 2.
The bump that starts a new minor is the only other pull request that sets RBS::VERSION. It
publishes nothing and another bump undoes it, so one opened on an explicit request can go through
on its own.
Open a pull request that carries everything the release needs:
lib/rbs/version.rb— setRBS::VERSIONto the version being released.Gemfile.lock— runbundle installafter the bump; the lockfile records the version too.CHANGELOG.md— add a section for the new version, directly under the# CHANGELOGheading. Sections are newest first.
Label the pull request skip-changelog. It carries no change of its own, and without the label it
shows up in the next release's list — that is why 4.1.0's changelog contains a Version 4.1.0
entry.
rake gem:changelog lists the pull requests merged since the last release, already formatted:
$ bundle exec rake gem:changelog | pbcopyWhere it starts follows RBS::VERSION, so bump the version first: a prerelease starts from the
latest tag, and a release proper skips the prerelease tags and starts from the previous release
proper. Pass a version to override it (rake 'gem:changelog[4.1.0]'). Only the list goes to
STDOUT, so it pipes cleanly. Pull requests labeled skip-changelog are left out and reported on
STDERR, and pull requests that only touch rust/ are left out because the crates have their own
release cycle.
On a release proper, the X.Y.Z.pre.N sections above the previous release are replaced by the one
section being written — their pull requests are in it, and the notes they were published with stay
on their own GitHub releases.
Sort the list into the sections below. rake gem:changelog:json prints the same pull requests with
the changed files, labels, and body of each, which is what the sorting is based on.
## X.Y.Z (YYYY-MM-DD)
### Signature updates
### Language updates
### Library changes
#### rbs prototype
#### rbs collection
### MiscellaneousThe sections always appear in this order; delete the ones that end up empty, which is most of them on a small release. Two things scale with the size of the release:
- Summary paragraphs, above the first section. A patch release usually has none, 4.1.0 has four paragraphs, and 4.0.0 has nine.
- A list of the types whose signatures changed, as the first line of
### Signature updates, written as**Updated classes/modules/methods:**followed by the names in backticks. Used onX.Y.0releases only.
The date is the day the gem is released, matching the vX.Y.Z tag — not the day this pull request
is opened. Fix it up before step 2 if the pull request sat for a few days.
Once the pull request is merged, dispatch
release-gems.yml from the Actions tab with two inputs:
| Input | Value |
|---|---|
commit |
The full 40-character SHA of the merge commit, taken from the merged pull request |
version |
X.Y.Z, without the leading v |
The ref selector picks which copy of the workflow file runs, not what gets released — leave it on
master. Everything is built from commit, so the run is unaffected by whatever lands on master
in the meantime, and a patch release cut from a release branch is dispatched the same way as any
other: the workflow does not care which branch the commit is on.
The two inputs say the same thing twice, once as a commit and once as a name, and the run stops before anything is built unless they agree with each other and with the repository:
commithas to be a full SHA that some branch contains,versionhas to be theRBS::VERSIONthat commit declares,- CHANGELOG.md has to start with a section for
version(skipped for.dev.N, which is not written up), vX.Y.Zmust not exist yet.
It then:
- builds
rbs-X.Y.Z.gem, - compiles
rbs_parser.wasmand buildsrbs-X.Y.Z-java.gem, - checks both: platforms, the C extension on one and its absence on the other, and that the wasm
module made it into the
javagem, - installs the
javagem on JRuby and parses with it, so the WebAssembly runtime is exercised before anything is published, - uploads both gems as an artifact,
- tags
commitasvX.Y.Zand pushes the tag, - pushes both gems to RubyGems through trusted publishing,
- publishes the GitHub release with the notes from CHANGELOG.md, skipping this last step for
.dev.Nversions.
The tag is created once both gems are known to build and run, and before anything is published: a tag can be deleted, while a version pushed to RubyGems can only be yanked.
Checking the dry_run box runs everything up to the artifact and stops — no tag, no gems pushed,
no release — which is how the build is exercised without releasing. version still has to match
the commit, so a dry run is also how a release is rehearsed before it is cut.
RBS::VERSION on master is read one of two ways, told apart by how the version ends:
On master |
Means |
|---|---|
X.Y.0.dev — a bare .dev |
X.Y.0 is being developed |
A complete version — X.Y.Z, X.Y.Z.pre.N, X.Y.Z.dev.N |
The version after the one named is being developed |
So 4.1.1 on master is not a claim that master is 4.1.1. It says 4.1.1 has shipped and what
comes after it is being worked on. 4.1.2.dev.1 says the same thing about itself: that release is
out, and the line continues towards 4.1.2.
Both become true the moment the release is tagged, so nothing has to be done to master after a
release. 4.0.1 was followed by 4.0.2 with no version change in between, and 4.1.2.dev.1 is
what master carries today.
The bare X.Y.0.dev is the exception because it is the one version that names a target rather than
a predecessor: a new minor is developed towards X.Y.0 for a long time, before it is known whether
the next thing to ship is X.Y.0.pre.1 or X.Y.0 itself. Setting it is the only version change
that has to be made deliberately.
rake gem:changelog reads RBS::VERSION too, to decide where the next changelog starts — but the
version is set to the one being released before the changelog is generated, so it sees that rather
than whatever master was carrying.
master is the development line of one minor at a time. Moving it from X.Y to X.(Y+1) is not
part of any one release — it is the decision that the X.Y line is done, taken whenever that
becomes true — and it is the one moment the version on master is changed by hand. Two changes, in
opposite places:
-
Branch the line being left behind, from the last
mastercommit that belongs to it:$ git switch --create aaa-X.Y.x <that commit> $ git push -u origin aaa-X.Y.x
Branch from the commit before the bump below, so the branch keeps the version its line was released under. Patch releases of
X.Yare cut from here from now on, with their changes cherry-picked frommaster— see Backports. Theaaa-prefix carries no meaning beyond sorting the release branches to the top of the branch list. -
Bump
mastertoX.(Y+1).0.dev, in a pull request withGemfile.lockregenerated and labeledskip-changeloglike the release pull request itself.4.1was started exactly this way:aaa-4.0.xwas branched at the commit beforeStart 4.1 development, which setRBS::VERSIONto4.1.0.dev.
Two loose ends that are easy to forget:
- The release note of the new line.
rake gem:gh_releaselinks every published release tohttps://github.com/ruby/rbs/wiki/Release-Note-X.Y, built from the version number without checking that the page is there. Nothing has to be written when the line starts — the page comes together as the first release proper of the line comes into view — but it does have to exist by the time that release is published, or its notes link to an empty page. - Release branches that are done. A branch is worth keeping only while its line might still
get a patch. The ones that exist do not cover every line that ever had one —
3.8.1shipped and there is noaaa-3.8.x— so this is housekeeping rather than a rule, but starting a new minor is the natural moment to look at the bottom of the branch list and delete what has been superseded.
A patch release is cut from a release branch (aaa-X.Y.x), and what it carries beyond the previous
release is cherry-picked from the development line. Cherry-pick with -x:
$ git cherry-pick -x <commit>-x records the commit the change was copied from, and that recorded line is what rake gem:changelog follows to reach the pull request the change was written and reviewed in. Without
it, the only pull request a backported commit is associated with is the one that carried the
backport, which says nothing about the change and is the same for every commit it brought over —
that is why the 4.0.3 changelog credits its three entries to the same pull request.
- Prereleases (
X.Y.Z.pre.N) are only installed withgem install rbs --pre; a plaingem install rbsis unaffected. On JRuby,gem install rbs [--pre]resolves to the-javagem automatically. - The WASI SDK version is pinned in
wasm.yml,jruby.yml,release-gems.yml, andDockerfile.jruby, each carrying its own copy. Keep them in sync when bumping. The Chicory/ASM versions are not duplicated: they are thejarrequirements inrbs.gemspec, which is where the workflow,Dockerfile.jrubyandgem installall read them from. rake 'gem:check_release[X.Y.Z]'andrake gem:tagare what the workflow runs to check the release and to create the tag. Both work locally, which is the fallback if the tag ever has to be created by hand.- Those two tasks and
rake gem:gh_releasecome from the Rakefile of the commit being released, not from the branch the workflow was dispatched from. Releasing from a release branch (aaa-X.Y.x) therefore needs the release tooling on that branch as well; without it the run fails on the missing task, before publishing anything.